Tendering N° |
N°032-22-AOO (publié le 04/04/2022) |
---|---|
Object |
Travaux de construction de mur de clôture et chemin de ronde à l’Aéroport de Benslimane |
Provisional Deposit (DH) (Made from a Moroccan approved bank) |
107 000,00 DHS |
The estimated cost of benefits is |
7 190 880,00 DHS |
Deadline |
28 April 2022 10:00 |
Downloading
![](/extension/onda_design/design/onda_design/images/unknown_extension.png)